Sales

Mine Dewatering

Our patented Multi-tube riser system is protectively rapped in a bundle so that each downhole component is protected from damage whilst installing or retrieving a pump, saving potential downtime and money.

 

The installation/abstraction process can take less than half an hour and be undertaken with minimal training. In reality a pump could be removed and installed in a back-up bore within an hour or two.

 

The units can also be fitted with telemetry for remote access to pumping and bore data.

 

With an input into the touchscreen you can set and forget, set either your preferred water level or preferred pumping rate, it will be targeted and maintained by the on-board computer. Once set personnel are not required.

 

Apart from re-fueling, these units are totally self contained, autonomous and extremely reliable.

Watch our animation on the home page.